26% (60)
•
428 views
•
2 pages
Miami Center Condenser Water System Retrofit Case Study
AI-enhanced description
This document details a $275,000 retrofit project at Miami Center that replaced a constant-volume condenser water system with variable-volume pumping, yielding annual energy savings of $92,882 and a payback of under three years. The project included installing Yaskawa variable frequency drives and premium efficiency motors on condenser pumps and cooling tower fans, along with a new direct digital control system and automatic valves.
Uploaded by
santiago52
Loading document…
Failed to load PDF
Download insteadYou might also like
PDF
39% (56)
Modulating Exhaust and Supply Fans for VAV Control and Building Pressurization Application Guide
1 pages
PDF
49% (100)
IQ Pump 1000 with SPBC Type 3R Compact Wiring Diagram
1 pages
PDF
13% (46)
MotionWorks IEC 3.0.3 Release Notes
10 pages
PDF
95% (54)
J1000 AC Drive Quick Start Guide
274 pages
PDF
52% (95)
U1000 Industrial Matrix Drive Brochure
1 pages
PDF
66% (21)
Yaskawa A1000 to GA800 AC Drive Transition Guide
52 pages
PDF
59% (68)
U1000 Series External Heatsink Installation Manual
12 pages
PDF
6% (20)
U1000 Industrial Matrix Drive Water Treatment Retrofit Case Study
5 pages
PDF
2% (33)
MPiec Controller VIPA Bus Coupler EtherNet/IP Configuration Guide
11 pages
PDF
35% (20)
R1000 Series Regenerative Converter CSA Certificate of Compliance
4 pages
Sponsored