MicroVersaTrip Plus and PM Conversion Kits Installation Instructions
This document provides detailed installation instructions for ABB-owned GE MicroVersaTrip® Plus and PM Conversion Kits, designed to upgrade existing GE Low Voltage Power Circuit Breakers (types AK-15, AK-25, AKU-25, AKR-30S, AKRU-30S) with enhanced solid-state trip units. It covers breaker preparation, component installation (flux shifter, programmer, sensors), four-wire ground fault options, equipment conversion, testing, and troubleshooting, emphasizing safety procedures and ANSI C37.59 compliance.
Failed to load PDF
Download insteadYou might also like
ABB-Welcome M22344-W Basic 4.3" Video Indoor Station Manual
32 pages
Tmax XT XT1 Fixed Part and Conversion Kit Environmental Product Declaration
17 pages
T7-T7M-X1 Auxiliary Position Contacts for Emax and Tmax Circuit Breakers
4 pages
ABB CM-ENS Liquid Level Monitoring Relay Safety and Installation Instructions
12 pages
IS/S 8.1.1 IP Switch Installation and Operating Manual
2 pages
FSO-12 and FSO-21 Functional Safety Module Rev. H Quick Guide
2 pages
ABB SR100A Recorder Chart Loading Instructions
2 pages
MUL1-R1 Option Kit Installation Instructions
4 pages
Cylinder Head Assembly Line System Profile
2 pages
COM Overcurrent Relay Manual
28 pages