0% (57)
•
1.1k views
•
12 pages
SW/S 4.5 4-Fold Week Time Switch Manual
AI-enhanced description
This document describes the ABB i-bus EIB 4-fold week time switch (SW/S 4.5), a DIN rail mounted device with day, week, and year programs for controlling EIB actuators via switching or value telegrams. It details technical specifications, memory locations, priority control, holiday programming, and application program options for up to 324 switching times.
Uploaded by
anna_779
Loading document…
Failed to load PDF
Download insteadYou might also like
PDF
81% (36)
6151 EB Switching Actuator Operating Instructions
8 pages
PDF
14% (67)
Conceptpower DPA 120 UL UPS Technical Data Sheet
19 pages
PDF
43% (36)
55-1555 Type 1 Enclosure Outline Drawing
1 pages
PDF
84% (23)
ABB ACH180 HVAC Drive Hardware Manual
182 pages
PDF
46% (11)
Airswitch MV Isolators and Switch-Disconnectors Installation, Operation and Maintenance Manual
52 pages
PDF
96% (11)
MS 325, MS 326, MO 325 Circuit Breakers Type Approval Certificate
3 pages
PDF
38% (99)
ISL-A 24 / ISL-A 48 Insulation Monitoring Device Manual
4 pages
PDF
48% (55)
Ekip E-Hub IoT Gateway Getting Started Guide
16 pages
PDF
21% (99)
TBM15I 15-Ton Hydraulic Compression Tool Head Technical Data Sheet
3 pages
PDF
40% (9)
CoriolisMaster FCB330/FCB350/FCH330/FCH350 Coriolis Mass Flowmeter Operating Instruction
100 pages
Sponsored