99% (83)
•
923 views
•
2 pages
ABB PowerWave 33 and PowerScale UPS Railway Project Reference
AI-enhanced description
This document details ABB's supply of PowerWave 33 and PowerScale uninterruptible power supplies (UPSs) for the North-South Railway (NSR) project in Saudi Arabia, the world's largest railway construction undertaking. The UPS systems protect IT, ticketing, telecom, surveillance systems, and the traffic control center across five passenger stations and the new Riyadh station, with commissioning completed during 2014.
Uploaded by
lucas_454
Loading document…
Failed to load PDF
Download insteadYou might also like
PDF
89% (56)
ABB DCS880 DC Drive Quick Guide
40 pages
PDF
26% (49)
Circuit-Shield Type 60 Voltage Balance Relay Manual
11 pages
PDF
16% (23)
Load Management Solutions for Grow Lighting Systems Application Note
14 pages
PDF
84% (45)
MS132-1T Circuit Breaker Tripping Characteristic Curve
1 pages
PDF
49% (1)
XFC6200EX Flow Computer Startup Guide
14 pages
PDF
56% (95)
ABB SA/S 4.20.1S 4-Fold Switch Actuator Manual
1 pages
PDF
49% (6)
MS165 and MO165 Manual Motor Starters Type Approval Certificate
3 pages
PDF
44% (84)
Relion 611/615/620 Series End-of-Life Instructions
28 pages
PDF
49% (84)
MS132-LC Lamp Circuit Breaker Tripping Characteristic Curve
1 pages
PDF
98% (35)
DCS550 Recycling Instructions and Environmental Information
16 pages
Sponsored