Centralized Protection and Control Pilot Implementation White Paper
This white paper details Salt River Project’s (SRP) pilot implementation of a Centralized Protection and Control (CPC) system at a 69/12.47 kV substation, transitioning from a distributed PAC approach to a centralized one using IEC 61850-based merging units and a CPC device. It covers the design, engineering, installation, testing, commissioning, and performance evaluation, including lessons learned during the COVID-19 pandemic, to demonstrate improved asset protection, flexibility, and lifecycle cost reduction.
Failed to load PDF
Download insteadYou might also like
D4-08NA and D4-16NA AC Input Modules for DL405 PLC Specification and Power Budget Guide
6 pages
SCC-U Series Power Distribution and Calibration Module Certificate of Compliance
3 pages
MISTRAL65 and MISTRAL65H Enclosures Technical Data
4 pages
VeriMaster Software Overview and Setup Guide
40 pages
MNS ACB Section for Emax2 Service and Maintenance Manual
32 pages
RED Relay Tool Operator's Manual
58 pages
ASO SENTIR edge 15.25 Safety Contact Edge Specifications
10 pages
SA/S 8.16.2.2 8-Fold Switch Actuator Manual
2 pages
OTM_F_ Motorized Switch-Disconnector Installation and Operating Instructions
16 pages
Busch-Infoline Power Supply Unit Insert Installation and Technical Manual
2 pages