9% (53)
•
1.4k views
•
6 pages
DPU/TPU/GPU 2000R IED Time Synchronization Application Note
AI-enhanced description
This application note explains the time synchronization methods for ABB DPU/TPU/GPU 2000R IEDs using Modbus or DNP 3.0 protocols. It details the internal clock operation, synchronization accuracy, and specific procedures for DNP 3.0 time synchronization, including delay measurement and IRIG B external synchronization.
Uploaded by
JEAN-77
Loading document…
Failed to load PDF
Download insteadYou might also like
PDF
16% (82)
1408W Grinder Motor Technical Specification
14 pages
PDF
18% (91)
PS-FBPA FieldBus Plug Accessory for PSR and PSE Softstarters Manual
4 pages
PDF
35% (19)
ELR72P/ELR72V24P Electronic Residual Current Relay Technical Manual
2 pages
PDF
99% (3)
K-Line Plus Low Voltage Power Circuit Breaker Installation and Maintenance Instructions
22 pages
PDF
99% (72)
ABB Low Voltage Products Life Cycle Status Update #26
5 pages
PDF
44% (33)
ABB SACE Emax 2 and Tmax XT Front Terminals Installation Instructions
2 pages
PDF
67% (48)
SCU100 Sub-distribution Control Unit Installation Manual
2 pages
PDF
17% (25)
Predictive Maintenance for Low-Voltage Circuit Breakers
4 pages
PDF
37% (53)
CPTC-02 ATEX Thermistor Protection Module Manual
60 pages
PDF
40% (7)
RP Series Recessed Architectural Battery Unit Installation Instructions
4 pages
Sponsored