SACE Emax 3 AUP Signalling Contacts Installation Guide
This document provides installation instructions for the SACE Emax 3 circuit breaker, detailing the wiring and connection of auxiliary signalling contacts (AUP) for left and right contact sets. It includes technical specifications for voltage ratings (24Vac, 400Vac), contact configurations (e.g., 2I/1T/2E, 4I/1E), torque settings (2.5 Nm), and wire gauge ranges (0.08 mm² to 1.5 mm²), along with multilingual safety notes for cable harness extraction.
Failed to load PDF
Download insteadYou might also like
TF12/TF212 PROFIBUS PA DTM Manual
20 pages
SACE Tmax T5D/PV-E Circuit Breaker Installation Instructions
4 pages
DeviceNet Master/Slave Application Manual for ABB Robots
124 pages
IP-Switch Master and Slave 5-fold MDRC Operating Instructions
24 pages
Contrans E A40 AC Transducer Operating Manual
6 pages
ABB Automation Builder 2.1.1 Release Notes
34 pages
ABB Ability System 800xA System Guide
82 pages
C1900 Circular Chart Recorder Advanced Software Options User Guide
36 pages
OT(M)1600E_ to 3200E_ Disconnectors Installation Instructions
40 pages
ABB Procontic T200 Programming System Language Description
88 pages